The arc
Steps 1–3 are yours: they map onto the onboarding wizard in the app, and ontoPOST calls in this API if you have write access. Steps 4–6 are Prophia’s, and none of the status fields they drive are writable over REST.
Onboarding is not one-and-done. Every new document added to a live building runs through the same extraction-and-curation loop, so documentStatus matters long after a building is handed off.
Document status: the atom
Everything else rolls up from here. A document normally goesprocessing → incomplete → any account-specific review states configured on your account → complete. Only complete means the data has been curated and signed off — every other value, built-in or account-specific, means it hasn’t. See Documents for the full table.
Lease rollup: docCompletionStatus
A lease’s docCompletionStatus is complete when every document on it is complete, and incomplete otherwise. One un-curated amendment holds the whole lease at incomplete — which is the point: a lease whose latest amendment hasn’t been read yet is not a lease you want to report on.
Building rollup: onboardingStatus
onboardingStatus tracks how far the building has moved through the process. It is read-only over this API.
ONBOARDING_COMPLETE is set automatically, and it happens once in a building’s lifetime. The system flips it when the building is not INACTIVE and every lease in it has finished document curation; the moment it flips, onboardingCompleteDate is stamped. It does not revert when a new document is later uploaded — a live building taking on a new amendment stays ONBOARDING_COMPLETE while that amendment works through the pipeline.onboardingStatus answers “did this building ever finish its initial onboarding?”, not “is this building’s data current right now.” For the current question, roll up docCompletionStatus across the building’s leases yourself.
The progression is also one-way in practice — a building at ONBOARDING_IN_PROGRESS or ONBOARDING_COMPLETE cannot be pushed back to INITIAL_SETUP or NOT_STARTED.
Building state: activeStatus
activeStatus is a different axis: it tracks the building record’s operational state and the internal review checkpoints, and it is also read-only over this API.
activeStatus: ACTIVE is the handoff signal, and it is the one worth building on. onboardingStatus: ONBOARDING_COMPLETE says the documents finished processing; ACTIVE says Prophia’s team is satisfied with the result and has released the asset.implementationManager on the building names the Prophia person responsible for that onboarding and review. It is not the account manager.
What lags during onboarding
Some building fields are caches rebuilt from the stacking plan rather than computed per request, so they can be stale while leases are still in onboarding:totalRentableSquareFootage, squareFootageLeased, squareFootageOccupied, squareFootageVacant
Each carries this caveat on the building endpoint. Don’t use them for point-in-time occupancy on a building that isn’t ACTIVE yet.
Putting it together for a sync job
1
Decide your bar
For reporting you can stand behind, filter buildings on
activeStatus=ACTIVE and leases on docCompletionStatus: "complete". For a fuller mirror, take everything and carry the status fields through so downstream consumers can decide.2
Poll for change, don't re-crawl
GET .../recent_changed_leases names the leases whose documents changed in a window. That covers both new documents arriving and existing ones reaching complete.3
Re-check status on every pass
A lease that was
incomplete last week may be complete now, with different tag values. Curation corrects machine extraction — treat pre-complete values as provisional and expect them to change.